Sunday, September 20, 2009

Welcome New Chicagoan!

From the comments:
  • Does anyone know what the f*ck is going on a HQ? A construction company is redoing the f*ck up by walsh construction when they originally built the building because water would pool by the west entrance. The new company has poured the concrete and has torn it up not once, not twice, but THREE F*CKING TIMES now and it's still not finished. This is insane and exactly why we should not get the olympics. Pitch the concrete towards the street morons.
Evidently, you've never seen a Chicago concrete pour in action. We figure they must save money by not having a surveyor look at the concrete forms after they nail them all together. We have yet to see a curb gutter in the past 28 years drain a street properly after being poured.

We can't recall ever seeing a city project that didn't have major cracking issues with any concrete construction. Remember the concrete columns cracking and flaking in the Monroe Street garage? They had to tear out dozens and wrap hundreds in wire meshing.

And if you truly want to see something amusing, go up to the 5th Floor at HQ and bring a dozen marbles and half as many Hot Wheels cars. Drop then at different points along the corridors and watch them roll! We've heard that Patrol Division has a Pinewood Derby Racing League every other Thursday and they don't even need ramps.

Labels:

42 Comments:

Anonymous Anonymous said...

CAN I HAVE AN EVENT NUMBER?

9/20/2009 12:11:00 AM  
Anonymous Anonymous said...

it's not the level of the concrete....it's the big sucking hole on the other side of the doors.

9/20/2009 12:39:00 AM  
Anonymous Anonymous said...

Didn't I read somewhere that it was Maggie Daley's brother, a retired, pension-drawing police commander, who was awarded the contract to build HQ?

What a surprise!

9/20/2009 12:39:00 AM  
Anonymous Anonymous said...

Has anyone seen how 001 is falling apart too...that building is not that old. Walk from the traffic section over to the 001 side and look in the hallway and you will see what I mean.....unreal!!

9/20/2009 01:10:00 AM  
Anonymous Anonymous said...

The city that works-if you're a little crooked.

9/20/2009 01:55:00 AM  
Anonymous Anonymous said...

When I worked in 001, I was on a jobsite and met one of the Walsh foremen that worked the Headquarters job (until a steel beam hit him in the head). He told me that the minority contarctor they hired (to meet the City's B.S. quota) used steel beams too thin to support the weight and the concrete poured was not thick enough, hence the dips in the floor (thank the Lord for rebar to hold the concrete together). Not to defend Walsh, and I truly think this guy didn't like the company he worked for, but it seemed that the City had an idea that the work to be done (by the plans submitted) would be substandard, but that they didn't care. GO 2016!!!!!!!

9/20/2009 03:26:00 AM  
Anonymous Anonymous said...

Please capitolize Walsh construction; I mean they have an exhibit in the Mooseeumm of Pschyirty and inullldtrialization....

9/20/2009 04:29:00 AM  
Anonymous Anonymous said...

Just think of the cost override for 2016 and the tax payer are going to be holding the bag. What does Da King care he would have already made his family and friends rich. Lets us not forget the construction companies who will use Inferior product to cut corners to make more money for themselves.Just look at HQ on a sidewalk repair it has taken a month and they still have not completed it and they keep pouring cement and tearing it up again, has this company no shame? They also work like city workers 20 people on the job 10 working and 10watching. If there is a GOD please do not let this city get the Olympics because the city will have a deficit like the federal goverment.

9/20/2009 06:54:00 AM  
Anonymous Anonymous said...

Damn it! These rumors must stop.
The pinewood derby is on Tuesday, not Thursday.

9/20/2009 06:56:00 AM  
Anonymous Anonymous said...

Summit Construction is one of the worst!

9/20/2009 06:57:00 AM  
Anonymous Anonymous said...

Has anyone seen how 001 is falling apart too...that building is not that old. Walk from the traffic section over to the 001 side and look in the hallway and you will see what I mean.....unreal!!

9/20/2009 01:10:00 AM


You must be talking about the giant horizontal crack that is making it's way around the building. They tried to fix it with caulk, which was initially kind of amusing. Now it is wide enough to use as a shelf.

It will cost a furtune to fix. The center of the building is sinking.

9/20/2009 07:43:00 AM  
Anonymous Anonymous said...

Just visit any of the Cook County courthouses and see the retirement home for concrete contractors where the steps to the courthouses are re-done annually.

9/20/2009 09:38:00 AM  
Anonymous Anonymous said...

MAGGIE IS NOT RELATED TO THE FORMER COMMANDER, ONLY BECUZ I KNOW, AND HE WAS TAKEN OFF THE PROJECT AFTER A DISAGREEMENT WITH THE POWERS TO BE. ANY FINGERPOINTING AT HIM WOULD BE WRONG AND YOU SHOULD USE THE SAME FINGER TO GO F-CK YOURSELF. THIS FORMER BOSS IS TOP SHELF, PERIOD.

9/20/2009 09:42:00 AM  
Anonymous Anonymous said...

Has that company ever built anything in this city that isn't falling apart?

9/20/2009 10:26:00 AM  
Anonymous Anonymous said...

Mentioning Walsh Construction Company reminds me. What part of their ever expanding company got the contract to put the fiberglass sticks on all the city fire hydrants? And why???? How and where do I apply to get the repair/replace/maintain the sticks contract????
Maybe they have the contract to predict the weather for the city too? The fiberglass sticks are the first part to prepare for the on coming blizzards they need, to raise the price of the contract to do the snow plowing?????? They could create their own market. This could lead to olympic sized contracts.......

9/20/2009 10:34:00 AM  
Anonymous Anonymous said...

In my neighborhood, I've seen the city put up fencing around Connors Park (a small park but nevertheless). First, the fencing installed was chest high, then right after the job was finished, it was torn down and redone mid calf high.

At this same park, I've seen it landscaped with a bed of flowers and right after the flowers were done, they were ripped out by the landscaping company and replaced with a solid bed of bushes.

A year or so ago, I observed street corners in the neighborhood being jack hammered and repoured as curb corners. Then, right after the concrete set, I saw them out there jackhammering the new curb and repouring the concrete so in the middle of the curb it tapers to street level. This was done as two blocks away a curb corner was being poured. Sure enough, after that curb and the next and the next...were poured, they were redone as tapered in the middle corners.

This year, they are out there again tearing up the tapered curbs and repouring them with some kind of traction square over the tapered center part of the curb. The non concrete traction square made of plastic or some thing placed in the middle of the tapered part of the curbs started coming up so they're sending private contractors out to counter sink screw the traction squares down.

This shit is crazy and it's not done by accident. There is a financial motive for the machine behind it.

If the rest of the country knew about this crap they'd know what Obama's single payer government health care really means.

Buck Naked
(not a cop)

9/20/2009 10:42:00 AM  
Anonymous Anonymous said...

Look at 35th street,plumbing issues, the gym had round dumbells but had to change to hexagon,so they would not roll away,the desks have shims so the drawers will not open on there own,the roof leaks, no drainage in the parking lots! My friend is a maintenance guy at midway and on the walk bridge from the entrace on the 3rd level to check in it needed 3 beams but they saved money and only used 2! The concrete struture under the departure area has concrete exposing steel mesh! Another city sponsored pay me off contract, no wonder everything is falling apart to much corrupt payoffs!

9/20/2009 11:43:00 AM  
Anonymous Anonymous said...

Anonymous said...
When I worked in 001, I was on a jobsite and met one of the Walsh foremen that worked the Headquarters job (until a steel beam hit him in the head). He told me that the minority contarctor they hired (to meet the City's B.S. quota) used steel beams too thin to support the weight and the concrete poured was not thick enough, hence the dips in the floor (thank the Lord for rebar to hold the concrete together). Not to defend Walsh, and I truly think this guy didn't like the company he worked for, but it seemed that the City had an idea that the work to be done (by the plans submitted) would be substandard, but that they didn't care. GO 2016!!!!!!!

9/20/2009 03:26:00 AM

It was an interesting comment until you added the BS regarding minority contractor. Just as many white contractors make bad decisions and make mistakes. Did trying to down another working company because it is minority owned made you feel like a bigger man today? You my friend will always be as small as your small mind!

9/20/2009 12:05:00 PM  
Anonymous Anonymous said...

When I worked in 001, I was on a jobsite and met one of the Walsh foremen that worked the Headquarters job (until a steel beam hit him in the head). He told me that the minority contarctor they hired (to meet the City's B.S. quota) used steel beams too thin to support the weight and the concrete poured was not thick enough, hence the dips in the floor (thank the Lord for rebar to hold the concrete together). Not to defend Walsh, and I truly think this guy didn't like the company he worked for, but it seemed that the City had an idea that the work to be done (by the plans submitted) would be substandard, but that they didn't care. GO 2016!!!!!!!

9/20/2009 03:26:00 AM

bullshit walsh get off our site. We all know the minority contarctor was your wife under another companies name.

9/20/2009 12:25:00 PM  
Anonymous Anonymous said...

And if you truly want to see something amusing, go up to the 5th Floor at HQ and bring a dozen marbles and half as many Hot Wheels cars. Drop then at different points along the corridors and watch them roll! We've heard that Patrol Division has a Pinewood Derby Racing League every other Thursday and they don't even need ramps.

Any word on who the Patrol Division Pinewood Derby Racing League Champ is?

9/20/2009 12:26:00 PM  
Anonymous Anonymous said...

'it's not the level of the concrete....it's the big sucking hole on the other side of the doors.'

SIMPLY HILARIOUS!!

9/20/2009 02:21:00 PM  
Anonymous SRT said...

First company layed concrete,second company ripped that up and did there own concrete. TBD if a third company needs to clean that shit up too.

9/20/2009 02:45:00 PM  
Anonymous Anonymous said...

Anonymous said...
When I worked in 001, I was on a jobsite and met one of the Walsh foremen that worked the Headquarters job (until a steel beam hit him in the head). He told me that the minority contarctor they hired (to meet the City's B.S. quota) used steel beams too thin to support the weight and the concrete poured was not thick enough, hence the dips in the floor (thank the Lord for rebar to hold the concrete together). Not to defend Walsh, and I truly think this guy didn't like the company he worked for, but it seemed that the City had an idea that the work to be done (by the plans submitted) would be substandard, but that they didn't care. GO 2016!!!!!!!

9/20/2009 03:26:00 AM

It was an interesting comment until you added the BS regarding minority contractor. Just as many white contractors make bad decisions and make mistakes. Did trying to down another working company because it is minority owned made you feel like a bigger man today? You my friend will always be as small as your small mind!

9/20/2009 12:05:00 PM

---------------------------
the truth hurts, dont it???

9/20/2009 06:22:00 PM  
Anonymous Anonymous said...

When I worked in 001, I was on a jobsite and met one of the Walsh foremen that worked the Headquarters job (until a steel beam hit him in the head). He told me that the minority contarctor they hired (to meet the City's B.S. quota) used steel beams too thin to support the weight and the concrete poured was not thick enough, hence the dips in the floor (thank the Lord for rebar to hold the concrete together). Not to defend Walsh, and I truly think this guy didn't like the company he worked for, but it seemed that the City had an idea that the work to be done (by the plans submitted) would be substandard, but that they didn't care. GO 2016!!!!!!!

9/20/2009 03:26:00 AM

Third world work ethic equals third world quality.

9/20/2009 07:09:00 PM  
Anonymous Anonymous said...

Someone was buried under the cement!

9/20/2009 07:17:00 PM  
Anonymous Anonymous said...

Anonymous said...
When I worked in 001, I was on a jobsite and met one of the Walsh foremen that worked the Headquarters job (until a steel beam hit him in the head). He told me that the minority contarctor they hired (to meet the City's B.S. quota) used steel beams too thin to support the weight and the concrete poured was not thick enough, hence the dips in the floor (thank the Lord for rebar to hold the concrete together). Not to defend Walsh, and I truly think this guy didn't like the company he worked for, but it seemed that the City had an idea that the work to be done (by the plans submitted) would be substandard, but that they didn't care. GO 2016!!!!!!!

9/20/2009 03:26:00 AM

It was an interesting comment until you added the BS regarding minority contractor. Just as many white contractors make bad decisions and make mistakes. Did trying to down another working company because it is minority owned made you feel like a bigger man today? You my friend will always be as small as your small mind!

9/20/2009 12:05:00 PM

His words, not mine. He said the contractor was inexperienced in this area (what they were hired to do) but was hired anyway to meet the minority quota, and cut beams and concrete to save money due to bad bidding.

9/20/2009 07:20:00 PM  
Anonymous Anonymous said...

Could you imagine what the Pyramids would look like in a few short years if Walsh Construction was hired to reproduce them?

9/20/2009 07:38:00 PM  
Anonymous Anonymous said...

Well just look at the job being done on Area 2. They replaced all that glass block with aluminum garage door panels.

The walls that are there to protect the building and it's occupants are nothing but sheet metal and foam, just like my insulated garage door. The panels are attached with caulking and sheet metal screws. What a joke!!! And do you think they would have allowed for a few windows to open to allow some ventilation, not a chance.

They came in a removed all of the radiator covers. The fins on the radiators are coved with 30 years of dust and grime. You would think they would have cleaned the fins before they painted and replaced the old covers. WROOOOOOONG!!! They panted the covers and just covered up all that filth.

The hanging sculpture was taken down before the construction began, you know it the cheese grader. The City claims it's worth $180,000.00.

A contractor was hired to come out to clean and restore the sculpture. WROOOONG again. This very expensive piece of junk, I mean art got shit canned by the contractor. That right it's gone forever.

They are telling us that the glass windows used in the remodel are bullet resistant, another lie. The windows are nothing but your every day thermo pane windows. Any kid with sling shot could launch a marble right through the windows and the foam walls into any of the offices in the building.

The City would never allow you to build a house or a commercial building using the materials used on Area 2.

It is just hard to believe that in this day and age that the City who claims to be prepared to fend off a terrorist attack. Would approve and actually and pay to have one of it's government buildings constructed with these materials.

I should not even mention the biggest security flaw in Area 2. There is nothing to prevent a U-Haul size truck from being driven right into the center of the building from the street or front parking lot.

But you better have your ID to get in the door!!!!!!!

9/20/2009 07:49:00 PM  
Anonymous Anonymous said...

Not the 5th floor, go to the 3rd Floor. S/E and S/W of the building. It has to be the worst there. There are even desk positioned in such a way so that the drawers don't open by themselves due to the pitch of the floor,and all because of the fucked up job done by Walsh Const. How do they get not only get to work on all city/govt buildings, but how are they still allowed to do business in our city?

9/20/2009 07:49:00 PM  
Anonymous Anonymous said...

"OFF TOPIC" THOSE BUMPER STICKERS REMINDED ME OF THE " BIAS FREE CITY STICKERS" THAT WERE ONCE PLACED ON THE REAR BUMPERS, BUT FELL OFF FROM THE USE OF INFERIOR GLUE FROM " WALSH CONSTRUCTION COMPANY".

9/20/2009 07:55:00 PM  
Anonymous cynic cyclist said...

Speaking of lousy construction, have you taken a close look at the condition of the concrete of South Lake Shore Drive recently? There's a lot of cracking, and it started 2 years ago. When I rode Bike the Drive, I was appalled by how bad it's gotten already, and it's only been a few years. Northbound near Soldier Field is the worst part.

Who needs to build anything well and actually have roads and buildings be safe? Seems like all these assholes care about is skimming a few more bucks and ensuring job security because the crap needs to be rebuilt too soon.

9/20/2009 08:01:00 PM  
Anonymous Anonymous said...

How about the overhangs at O'Hare? Now THAT is money-sucking monstrosity. Beams are re-inforced with other beams because of IMPROPER MEASUREMENTS. Now that is what I call quality city engineering. not.
The Olympics will be a money-grabbing, poorly-planned (ala Daley) event that the TAXPAYERS are GUARANTEED to cough up.

9/20/2009 08:52:00 PM  
Anonymous Anonymous said...

Everyone can blame the public building commission, they gave the CPD an occupancy permit even though it was not meant to be occupied, there was even a citizen that filed a lawsuit against the city and they even hired a private construction company to evaluate the job and that company (Alberg) even told them it was a shit job and a occupancy permit should have never been issued so what does the city do, they SETTLE the lawsuit and keep itas is, so everyone taht is working down there you are sitting on a gold mine if you live when it collapses......

9/20/2009 09:56:00 PM  
Anonymous Anonymous said...

if you think its bad now wait until the building ages.... and settles, and what about stress load from these on even floors...

9/20/2009 10:33:00 PM  
Anonymous Anonymous said...

Don't know about concrete, but the Superintendent has FINALLY done something great for the department! Sergeant Ray Hamilton of the famed "Policy Group" was upgraded to LT's pay now that he is classified "Legal Officer II." It's about time the leader of the team that flawlessly brought the carbine program up and running and the invaluable Lecture Series program was given a bump in pay with his take-home car. Keep up the good work Ray!!!!!!

9/20/2009 11:13:00 PM  
Anonymous Anonymous said...

His words, not mine. He said the contractor was inexperienced in this area (what they were hired to do) but was hired anyway to meet the minority quota, and cut beams and concrete to save money due to bad bidding.

9/20/2009 07:20:00 PM

Who is he and becuase you posted it, it is true? By the way, since I know buiding security, I called one of my buddies who informed me of the sub contractor. He was no minority and it was not becuase of a mistake by the way. They also put it down and tore it up once and the reason had nothing to do with what is posted here. I can't say, then I will get my guy in trouble, but you are no where near the truth in this matter. Stick with what you know, SHIT!

9/20/2009 11:28:00 PM  
Anonymous Anonymous said...

Look at other cities. They don't have to waste millons upon millons EVERY year repairing roads that already have cost of millions to update. They use a completely different material; one that doesn't errode as quickly as the shit we pay for.Every year it's the same old thing. POT HOLES, POT HOLES, and more POT HOLES. WTF. NOBODY ELSE GOES THROUGH THIS SHIT>

All I have to say is; when Shortshanks' shit finally comes to light, and the depth of his "pocket lining" is revealed. You are going to be amazed.

9/21/2009 12:23:00 AM  
Anonymous Anonymous said...

'Third world work ethic equals third world quality.'

The sad truth is, at least in Shitcago, that the vast majority of "minority" firms that do business here are actually owned by the Irish/Itialian Mafia folks who get the majority of City business anyway. Who's kidding whom?

9/21/2009 02:32:00 AM  
Anonymous Anonymous said...

You don't even need marbles of derby cars to detect the wavy floors at HQ.

Just open your eyes and grab for the dramamine, because it looks like the ocean waves in there.

9/21/2009 09:42:00 AM  
Anonymous Anonymous said...

'Third world work ethic equals third world quality.'

The sad truth is, at least in Shitcago, that the vast majority of "minority" firms that do business here are actually owned by the Irish/Itialian Mafia folks who get the majority of City business anyway. Who's kidding whom?

9/21/2009 02:32:00 AM
At one time it was believed that the Gangster Disciples had a front
company that was receiving contracts as a sub contractor doing government finaciaed projects. Numerous ranking members were working for this company and ranking members families members were documented as part of this companies management. I have no idea what became of this investigation.

9/21/2009 10:51:00 AM  
Anonymous Anonymous said...

Not the 5th floor, go to the 3rd Floor. S/E and S/W of the building. It has to be the worst there. There are even desk positioned in such a way so that the drawers don't open by themselves due to the pitch of the floor,and all because of the fucked up job done by Walsh Const. How do they get not only get to work on all city/govt buildings, but how are they still allowed to do business in our city?

9/20/2009 07:49:00 PM

Plus, from all directions, the center of HQ's is on the 3rd floor. After construction was completed, the integrity of the concrete floor was compromised because numerous, large, through and through holes were drilled in order to accomodate wire chases. It is a weak point and when HQ falls down, the implosion will start dead center of the building.

9/21/2009 01:18:00 PM  
Anonymous Anonymous said...

They were in the 1st Dist taking measurements of the cracks and the sinking building that was built on a junk yard.

9/21/2009 02:40:00 PM  

Post a Comment